Gold Member Since 2016
Audited Supplier
Qingdao Protech Rubber&Plastic Co., Ltd.

Plastic Parts, Plastic Products, Plastic Cover manufacturer / supplier in China, offering Overmold Rubber Plastic Parts, Titanium Parts, Rubber Bushing Part /Rubber Sheath and so on.

(/ )

Supplier Homepage Product Plastic Overmold Parts Overmold Rubber Plastic Parts

Overmold Rubber Plastic Parts

FOB Price: US $0.05 / Piece
Min. Order: 1,000 Pieces
Min. Order FOB Price
1,000 Pieces US $0.05/ Piece
Get Latest Price
Production Capacity: 1, 000, 000units/Month
Transport Package: Inner PP Bag+Carton Box+ Pallet(If Needed)
Payment Terms: T/T, Paypal, Money Gram, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: Protech-58
  • Surface Finish Process: Polishing
  • Plastic Material: ABS, PC, TPE, TPR, Rubber D
  • Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware
  • Installation: Fixed
  • Standard: DME
  • Trademark: Protech
  • Origin: Qingdao, China
  • Shaping Mode: Injection Mould
  • Mould Cavity: Multi Cavity
  • Process Combination Type: Compound Die
  • Design Software: Pro-E
  • Certification: TS16949, CE, SGS, FDA
  • Customized: Customized
  • Specification: Customized
  • HS Code: 39269090
Product Description
Qingdao Protech Rubber&Plastic is one-stop manufacturer of rubber plastic  mold and finished rubber plastic  products.  Protech can make various rubber mats per your drawings or samples.
Overmold Rubber Plastic Parts
 


Plastic Rubber Material:ABS,PC, PP, PS, Polyamide,PA, Bakelite, Glass fiber , NBR, Silicone, EPDM, TPE,TPR,TVR
Tool Material ASSEB,H13,718H,S136H,NAK80,P20
FinishAnodizing, Conversion Coating, Nickel plating, Zinc Plating, Chemical Polishing, Electric  Polishing, Mechanical Polishing, Powder Coating, Painting, Glass bead blast, Sand blast, Passivation, Chemical Cleaning and Heat treatment, etc.
Industries Appliance/ Automotive/ AgriculturalElectronics/ Industrial/ Marine Mining/ Hydraulics/ Valves Oil and Gas/ Electrical/ Construction
Drawing FormatPro-E(Igs, step, stp, etc), SolidWorks, AutoCAD
Mold cavitySingle or multi-cavities
Lead timeTooling 15-45days depends on the structure of the drawing
 Samples: 1-2days after tooling
 Production:10days after the samples approved (also depends on order quantity )
Quality ISO9001:2008 certificated factory
Reports RoHS, FDA, UL, REACH , MDS, MSDS 
Packing inner PP bag+carton box+ Pallet(if needed), or special packing
Shipping WayExpress like DHL UPS FedEx TNT , or Air or Ocean 
Overmold Rubber Plastic Parts
Send your message to this supplier
Avatar
Ms. Candy Lee
Sales Manager
*From:
To: Ms. Candy Lee
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now